快捷方式:发布信息| 收藏公司

地铁隧道专用不锈钢接水盒 变形缝接水槽 1.5mm不绣钢接水盒

产品/服务:
有效期至: 长期有效
最后更新: 2018-03-13 00:45
单价:
面议
最小起订量:
100 米
供货总量:
100000 米
立即询价

(发货期限:自买家付款之日起 天内发货)

诚信档案

  • 所在地区:河北
  •   
  • 收藏本公司 人气:528
    • 详细说明
    • 规格参数
    • 联系方式

    韩立隐隐的听到了银月在其脑中似乎隐隐轻笑了一声。
    左子穆眼见反客为主之势已成,要想这少女透露什么消息,非得自己先说不可,目下事势紧迫,又当着这许多外客,总不能抓下这小姑娘来强加拷问,便道:“姑娘请下来,待我详加奉告。”那少女双脚荡了荡,说道:“详加奉告,那倒不用,反正你的话有真有假,我也只信得了这么三成四成,你随便说一些吧。”

    用于混凝土变形缝,结构完成后,用水泥钉固定在墙面上,周边抹上聚氨酯密封胶防水,接水盒防止漏水后外溢。
    For concrete deformation joint, after the structure is completed, the cement nail is fixed on the wall, and the periphery is covered with polyurethane sealant to prevent water leakage and overflow.
    1.主体结构与交接变形缝,与附属结构接口处变形缝。接水盒在主体交接安装在每条变形缝的顶板和侧    墙位置。

    地铁专用不锈钢接水盒 变形缝接水槽 1.5mm不绣钢接水盒地铁专用不锈钢接水盒但貌似这样视若无睹的一句不问此事。

    The 1. main structure and tunnel connection deformation joint, and the deformation joint at the interface of the subsidiary structure. The water receiving box is installed on the roof and side wall of each deformation joint in the main body.
    不锈钢接水盒每块长2000mm,宽200mm,两翼宽各30mm,厚度为1mm。
    Stainless steel water box each length 2000mm, width 200mm, wing width of 30mm, thickness of 1mm.
    2、施工
    2. Construction preparation
    材料:1mm厚不锈钢接水盒、聚硫密封胶、密封胶、螺钉。 工具:电镐,电钻。
    Material: 1mm thick stainless steel water box, polysulfide sealant, sealant, screw. Tools: electric drill.
    3、施工工艺
    3, construction technology
    施工顺序:变形缝清理→涂抹聚硫密封胶→接水盒安装、固定→接水盒密封处理
    Construction sequence: deformation joint cleaning, smearing polysulfide sealant, installing and fixing water box, sealing treatment of water box
    1)、首先将变形缝清理干净,保证变形缝处混凝土面的平整。
    1) first, clean up the deformation joint to ensure the concrete surface of the deformation joint is smooth.
    2)、然后在变形缝内涂抹15mm深的聚硫密封胶。
    2) and then apply 15mm deep polysulfide sealant in the deformation seam.
    3)、接水盒应安装在顶板变形缝和侧墙变形缝上,安装时变形缝应位于接水盒中间位置。


    听说这位拥有天阳火脉,不知是真是假。地铁专用不锈钢接水盒 变形缝接水槽 1.5mm不绣钢接水盒
    3) the water box should be installed on the roof deformation joint and the deformation joint on the side wall, and the deformation joint should be located in the middle of the water box when the installation.
    4)、接水盒两翼用间距为300mm的螺钉固定并用密封胶密封。在接水盒的搭接处应确保接
    4) the two sides of the water box are fixed with 300mm screw and sealed with sealant. The joint of the water box should be connected
    水盒的搭接长度不小于100mm,并且下侧的接水盒包住上侧的接水盒,使水不能从接水盒
    The water box of the lap length not less than 100mm, and the water box on the side of the living water box connected below, the water from water box
    漏出。
    Leakage.

    地铁专用不锈钢接水盒 变形缝接水槽 1.5mm不绣钢接水盒

    第二元婴到了这般程度。
    段誉却仍是抬起了头望着她,见那少女双脚荡啊荡的,似乎这么坐梁上甚是好玩,问道:“姑娘,是你救我的么?”那少女道:“那恶人打你,你为什么不还手?”段誉道:“我不会还手……”

     

    "};

    您可以通过以下类目找到类似信息:

     

    免责声明:以上所展示的信息由会员自行提供,内容的真实性、准确性和合法性由发布会员负责。中国家居新闻网对此不承担任何责任。

    友情提醒:为规避购买风险,建议您在购买相关产品前务必确认供应商资质及产品质量!